The original factory is being consolidated into the new facility and the Bruckner stenters, the first of which has been in operation since 2007, are currently being moved to Palin with the support of Bruckner technicians.
The Cavitec high-performance portfolio of coating, laminating and impregnating solutions is now extended with the launch of a two-in-one machine featuring rapid switching between rotogravure and full-surface coating.